Trace Masterbatch from Sample to Finished Product worksheet
| Decision point | What to record |
|---|---|
| Identify received lots at the first handoff | Grade, supplier lot and receiving reference |
| Link lots to actual material usage | Line, run, time interval and component lots |
| Link output and retained references | Finished lot, inspection record and retain ID |
| Test the trace before release | Backward check, forward check, gap and owner |
Identify received lots at the first handoff
Record the masterbatch grade and lot from the bag or pallet along with quantity, receipt date and document reference. Keep the same ID in inventory.
Link lots to actual material usage
At production, capture which masterbatch lot and base-resin lots entered each run and when lots changed. Where a run uses more than one lot, retain each link and the affected time range.
Link output and retained references
Tie output lot or roll IDs to the run record, inspection and retained specimen. Keep enough identifiers to trace in both directions during a quality review.
Test the trace before release
Pick one finished lot, trace it back to raw-material lots and documents, then trace a masterbatch lot forward to the output it could affect. Record any gap and its owner.
Keep the batch evidence connected
- Incoming split A → trial run and retained specimen
- Incoming split B → production run and finished lot
Common questions
Is a grade name enough for a complaint?
No. Include lot, sample and production references.
Should substitutions be invisible to the buyer?
No. Material changes require the agreed review and approval.