White masterbatch quotation comparison

CheckSupplier ASupplier BEvidence / decision
Candidate identity Grade, carrier and sample lot Grade, carrier and sample lot Match TDS revision and proposed order
Quoted unit price Currency and net kg basis Currency and net kg basis Record quote validity and quantity bracket
Receiving point Named place and charges included Named place and charges included Add only buyer-paid costs once
Qualification Actual dose and outcome Actual dose and outcome Same geometry and acceptance method
Release decision Pass / fail / pending Pass / fail / pending State written conditions for first order

Send one brief to every supplier

Share the base resin and grade, process, finished thickness, white shade reference and separate opacity criterion where relevant. Ask for the proposed grade code, carrier, trial sample lot, and which values the supplier will commit to in writing. Give the trial quantity and the production quantity separately so a sample offer cannot be mistaken for repeat-order terms.

Put both prices at the same receiving point

Record net weight, currency, quote expiry and the delivery basis with its exact named place. If the parties use Incoterms® 2020, record the rule and named point together. Identify which freight, handling, duty and other costs your team actually pays. Use one documented exchange rate and date when comparing currencies. Avoid adding a charge that is already included.

Check which offer has trial evidence

Match the quote to the sample, TDS revision and available batch documentation. Run each proposed grade at its measured dose using the same resin, finished geometry and acceptance method. Record pass, fail or pending separately for appearance and conversion. Use the equal-performance calculator only after both offers meet the same acceptance target.

Compare apparently different unit quotes

In an illustrative comparison, A costs USD 2.10/kg and needs another USD 0.18/kg to reach the comparison point. B costs USD 2.24/kg and needs another USD 0.04/kg. Both become USD 2.28 per net kilogram on that basis. If one dose is not qualified, enter its cost as pending in the decision record. These figures are arithmetic examples.

Write down the purchase decision

Keep the qualified grade ID, acceptable substitution rules, document scope, package net weight, quote validity and who will sign off on changes. For a first order, tie release to an approved sample or documented trial. Sellers can speed the review by returning this information with each offer and marking genuinely unavailable items as pending.

Common questions

Can I select the lower price per kilogram?

Use the price per net kilogram as an input. A grade requiring a different approved dose can change the total blend cost, and the offers may also include different delivery costs.

Should I compare MOQ and lead time at the sample price?

Ask the supplier for trial terms and production terms independently. Record minimum order, lead time basis and quote validity for each written quantity offer.

Send a comparable quote request